Case Study

Tiffany & Co

Project: Tiffany & Co,
Heathrow Airport,
Terminal 2 Airside,
Hounslow TW6 1JH

TMP Interiors were engaged by repeat order client Edmont to carry out works in a live terminal at London Heathrow Airport, works were carried out during both day and night to compensate both a demanding programme and restrictions on site due to site operations.

Get in touch with us
Tiffany & Co

Project Info

Works carried out included partition and lining walls set out with bespoke CNC cut skirting details, constructed from metal stud, bendable plywood and Gypsum Glasroc. Suspended ceiling with concealed lighting details constructed from Gypsum plasterboard and fibrous plaster casted sections and varied inlaid areas of slatted metal extrusions to create areas of open cell.

The project was hugely demanding with long lead in items such as glazed façade panels and curtain wall frames being installed on site long after the interior walls had been constructed, integration of recessed and concealed services and vast amounts of trade coordination on site in a very constrained footprint.

Collaboratively with our client’s project team and the rest of the supply chain we were able to deliver an end product that has been very well received and is now operational to the general public when passing through London Heathrow Airport Terminal 2.

VIEW ALL CASE STUDIES

TO DISCUSS YOUR NEXT PROJECT, PLEASE CALL 01753 644904

Contact us